TY - JOUR T1 - The Analysis of Factors Affecting Overdue Contract Period of Maloy Sea Port’s Trestle Construction Project in East Kutai Regency, East Kalimantan AU - Aziz, Subandiyah AU - Wahyudi, Andik AU - Hargono D. Putranto, Edy JO - Journal of Engineering and Applied Sciences VL - 12 IS - 24 SP - 7656 EP - 7661 PY - 2017 DA - 2001/08/19 SN - 1816-949x DO - jeasci.2017.7656.7661 UR - https://makhillpublications.co/view-article.php?doi=jeasci.2017.7656.7661 KW - Contract period KW -trestle construction KW -Maloy KW -East Kalimantan KW -strategies KW -project AB - The Maloy sea port trestle construction project in East Kutai of East Kalimantan in 2014 has overdue on the average of 15% from the contract period. This study aims to find out the factors that influence the overtime contract period and to reveal the most dominant factor and strategies to overcome the problem. The methodology used here is factor analysis and multiple linear regression analysis toward questionnaires that were distributed to 56 respondents of owner, contractor and supervision consultant who were involved in the project. Based on the result of study with F-test, it is found that human resource (X1 ), job implementation method (X2), timeline (X3 ), supervision (X4 ), equipment (X5 ), work environment (X6 ), material (X7 ) and finance (X8) have mutual effect on overtime contract period on the Maloy sea port of trestle construction project in East Kutai of East Kalimantan, Fcount = 11.297> Ftable = 2.140. However, based on t test partially, the factors that count table significantly influence the overtime contract period on the Maloy sea port of trestle construction project in East Kutai of East Kalimantan are human resources (X1 ), material (X7) and finance (X8). The most dominant factor is shown by the highest standardized value of $ that is human resources factor (X1 ). The strategy to overcome the problem is that the contractor should assign some experts and hire the number of human resources to work based on the skills and needs in carrying out the work and the contractor must have good financial management, regular and timely payment of wages and contractors should send the materials on time, especially, local or non-local materials to the project site. ER -