files/journal/2022-09-02_12-54-44-000000_354.png

Journal of Engineering and Applied Sciences

ISSN: Online 1818-7803
ISSN: Print 1816-949x
108
Views
0
Downloads

Improvement of Drilling and Blasting in Underground Mine/Tunnel: A Case Study of Cominak Mine Niger Republic

M.A. Saliu and J.M. Akande
Page: 1546-1552 | Received 21 Sep 2022, Published online: 21 Sep 2022

Full Text Reference XML File PDF File

Abstract

In underground mining and tunnelling, the often-unpredictable variability in ground conditions always leads to application of sub optimal drilling and blasting patterns, which results to poor performance. This research work is aimed at achieving advance of 3 m per round in Akouta Mining Company in Niger Republic. Hence, eleven tests of four types of cuts were carried out. The resultant advance per test is measured. Of the four types of cut only one, cut 9/13 gave advance of 2.9 m, which is close to the desire advance. The poorest of all is cut 12/20 with the entire charge blow out.


How to cite this article:

M.A. Saliu and J.M. Akande . Improvement of Drilling and Blasting in Underground Mine/Tunnel: A Case Study of Cominak Mine Niger Republic.
DOI: https://doi.org/10.36478/jeasci.2007.1546.1552
URL: https://www.makhillpublications.co/view-article/1816-949x/jeasci.2007.1546.1552