files/journal/2022-09-02_12-54-44-000000_354.png

Journal of Engineering and Applied Sciences

ISSN: Online 1818-7803
ISSN: Print 1816-949x
124
Views
0
Downloads

Development of Model for Determination of Crew-Size Requirements for a Bolt and Nut Manufacturing Industry

K.A. Adebiyi , L.O. Mudashiru and A.O. Ajayeoba
Page: 1782-1785 | Received 21 Sep 2022, Published online: 21 Sep 2022

Full Text Reference XML File PDF File

Abstract

Effective and efficient running of bolt and nut manufacturing industry demands determination of it’s optimal crew-size requirement. In this study, a model was developed to determine the number of manpower required (Q) in terms ofannual production target (µ); production efficiency (P) machine efficiency (P o) and operators efficiency (P m); expected number of required man-hours (N) and the total production time (T). Data were collected from Oyeladun Manufacturing Industry, Ogbomoso Oyo State on types and number of machine tools available; working hours per day; number of working days per week. The model parameters were estimated as follows µ (52,240), P (85%) and N (0.1877). The optimal number of personnel required by the organization was estimated to be six.


How to cite this article:

K.A. Adebiyi , L.O. Mudashiru and A.O. Ajayeoba . Development of Model for Determination of Crew-Size Requirements for a Bolt and Nut Manufacturing Industry.
DOI: https://doi.org/10.36478/jeasci.2007.1782.1785
URL: https://www.makhillpublications.co/view-article/1816-949x/jeasci.2007.1782.1785