files/journal/2022-09-02_12-54-44-000000_354.png

Journal of Engineering and Applied Sciences

ISSN: Online 1818-7803
ISSN: Print 1816-949x
104
Views
0
Downloads

Review of a Possibility to use Bulldozers at Vostochno-Bernikovskiy Deposit

Dmitry Nikolaevich Ligotsky
Page: 6460-6464 | Received 21 Sep 2022, Published online: 21 Sep 2022

Full Text Reference XML File PDF File

Abstract

The open pit capacity has been increasing over the last year, thus, creating favourable conditions to apply modern mining and hauling equipment and to adopt new advanced mining processes at Vostochno-Bernikovskiy deposit. The open pit operations are equipped with a large fleet of different equipment, however, the basic technical and economic performance indicators (productivity, profitability of mining company and others) are not improving at sufficient rate. The study contains the research data for the dependence of bulldozer performance on the average mucking distance and seismic velocity, adjustment factor for surface slope (downward or upward) as well as an assessment of the rock breaking characteristics by the seismic wave speed using a single-shank or multi-shank adjustable parallelogram ripper and a bulldozer with a capacity of 634 kW and weight 104.5 t. These results allow development of non-explosive mining technologies for construction materials as well as improving technical and economic performance of the open pit.


How to cite this article:

Dmitry Nikolaevich Ligotsky. Review of a Possibility to use Bulldozers at Vostochno-Bernikovskiy Deposit.
DOI: https://doi.org/10.36478/jeasci.2019.6460.6464
URL: https://www.makhillpublications.co/view-article/1816-949x/jeasci.2019.6460.6464